GlobalID stringlengths 36 36 | InfraYear int64 2.02k 2.03k | Region stringclasses 16 values | Province stringclasses 98 values | Municipality stringlengths 11 52 ⌀ | ImplementingOffice stringclasses 203 values | ProjectID stringlengths 11 11 | ProjectDescription stringlengths 37 314 | ProjectComponentID stringlengths 15 15 | ProjectComponentDescription stringlengths 74 359 | Program float64 | TypeofWork stringclasses 18 values | infra_type stringclasses 1 value | Longitude float64 117 127 | Latitude float64 5.77 20.5 | ContractID stringlengths 8 8 | ABC float64 1.16M 311M | ContractCost float64 1.15M 290M | CompletionDateOriginal float64 1,539B 1,770B ⌀ | CompletionYear int64 2.02k 2.03k | Contractor stringlengths 10 199 | ObjectId int64 1 9.86k | CreationDate int64 1,754B 1,754B | Creator stringclasses 1 value | EditDate int64 1,754B 1,754B | Editor stringclasses 1 value | FundingYear int64 2.02k 2.03k | LegislativeDistrict stringclasses 252 values | DistrictEngineeringOffice stringclasses 199 values | ABC_String stringlengths 7 72 | ContractCost_String stringlengths 7 72 | CompletionDateActual stringdate 2022-07-01 00:00:00 2025-05-30 00:00:00 | StartDate stringclasses 739 values | type stringclasses 1 value | slug stringlengths 44 273 | _geo stringclasses 1 value |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
79e8be69-90ab-488d-bf10-9204d41338ab | 2,024 | Region IV-B | PALAWAN | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN) | Palawan 3rd District Engineering Office | P00824759LZ | Construction of Babuyan River Flood Control Strucure Downstream (RS), Palawan | P00824759LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Babuyan River Flood Control Strucure Downstream (RS), Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 118.89245 | 9.99653 | 24EG0058 | 17,963,475 | 17,961,569.07 | 1,720,828,800,000 | 2,024 | AZARRAGA CONSTRUCTION | 1 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (THIRD LEGISLATIVE DISTRICT) | Palawan 3rd District Engineering Office | 17963475 | 17961569.07 | 2024-05-23 | 02/15/2024 | flood_control | construction-of-babuyan-river-flood-control-strucure-downstream-rs-palawan-24eg0058 | [object Object] |
dea02c2f-d69d-4757-8d21-853e001736c5 | 2,024 | Region IV-B | PALAWAN | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN) | Palawan 3rd District Engineering Office | P00824758LZ | Construction of Flood Control Strucurue along Langogan River Downstream (LS), Palawan | P00824758LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Strucurue along Langogan River Downstream (LS), Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 118.89251 | 9.99761 | 24EG0057 | 17,370,000 | 17,369,992.99 | 1,721,692,800,000 | 2,024 | AZARRAGA CONSTRUCTION | 2 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (THIRD LEGISLATIVE DISTRICT) | Palawan 3rd District Engineering Office | 17370000 | 17369992.99 | 2024-07-19 | 02/23/2024 | flood_control | construction-of-flood-control-strucurue-along-langogan-river-downstream-ls-palawan-24eg0057 | [object Object] |
7177ab8b-b330-40f5-bdda-44ce7823ddf8 | 2,024 | Region IV-B | PALAWAN | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN) | Palawan 3rd District Engineering Office | P00824750LZ | Construction of Babuyan River Flood Control Strucure Upstream (LS), Palawan | P00824750LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Babuyan River Flood Control Strucure Upstream (LS), Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 118.89323 | 9.99671 | 24EG0017 | 18,335,000 | 16,802,607.63 | 1,721,779,200,000 | 2,024 | F.F. GALANG CONSTRUCTION | 3 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (THIRD LEGISLATIVE DISTRICT) | Palawan 3rd District Engineering Office | 18335000 | 16802607.63 | 2024-07-24 | 02/23/2024 | flood_control | construction-of-babuyan-river-flood-control-strucure-upstream-ls-palawan-24eg0017 | [object Object] |
fcf681df-bf3b-47a6-8807-01f94106bef9 | 2,023 | Region IV-B | PALAWAN | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN) | Palawan 3rd District Engineering Office | P00737551LZ | Construction of Flood Control Structure, Barangay Maoyon, Puerto Princesa City, Palawan | P00737551LZ-CW1 | Construction of Drainage Structure - Construction of Flood Control Structure, Barangay Maoyon, Puerto Princesa City, Palawan | null | Construction of Drainage Structure | Flood Control Structures | 118.899702 | 10.002658 | 23EG0016 | 4,900,000 | 4,899,590 | 1,682,035,200,000 | 2,023 | PALBIC CONSTRUCTION AND SUPPLY | 4 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PALAWAN (THIRD LEGISLATIVE DISTRICT) | Palawan 3rd District Engineering Office | 4900000 | 4899590 | 2023-05-05 | 02/15/2023 | flood_control | construction-of-flood-control-structure-barangay-maoyon-puerto-princesa-city-palawan-23eg0016 | [object Object] |
a3d64d20-0d8d-4b61-abdd-38a3bd840c77 | 2,024 | Region IV-B | PALAWAN | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN) | Region IV-B | P00823565LZ | Construction of Tanabag River Waterway, (Upstream Rightside), Palawan | P00823565LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Tanabag River Waterway, (Upstream Rightside), Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 118.990177 | 9.999043 | 24E00127 | 154,400,000 | 154,395,357.9 | 1,737,072,000,000 | 2,024 | OCTAGON CONCRETE SOLUTIONS INC. / MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | 5 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (THIRD LEGISLATIVE DISTRICT) | Palawan 3rd District Engineering Office | 154399999.99 | 154395357.94 | 2024-09-05 | 03/09/2024 | flood_control | construction-of-tanabag-river-waterway-upstream-rightside-palawan-24e00127 | [object Object] |
8b63bf01-6143-4d81-bccb-2a14cd258943 | 2,024 | Region IV-B | PALAWAN | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN) | Palawan 3rd District Engineering Office | P00824756LZ | Construction of Flood Control Strucurue along Langogan River Upstream (LS), Palawan | P00824756LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Strucurue along Langogan River Upstream (LS), Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.12203 | 10.02967 | 24EG0055 | 17,370,000 | 17,369,997.4 | 1,727,740,800,000 | 2,024 | MAINTIN CONSTRUCTION & SUPPLY | 6 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (THIRD LEGISLATIVE DISTRICT) | Palawan 3rd District Engineering Office | 17370000 | 17369997.4 | 2024-09-17 | 02/15/2024 | flood_control | construction-of-flood-control-strucurue-along-langogan-river-upstream-ls-palawan-24eg0055 | [object Object] |
997edf5c-a750-46f8-ba98-7c48760656da | 2,024 | Region IV-B | PALAWAN | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN) | Palawan 3rd District Engineering Office | P00824757LZ | Construction of Flood Control Strucuruealong Langogan River Upstream (RS), Palawan | P00824757LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Strucuruealong Langogan River Upstream (RS), Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.12383 | 10.02881 | 24EG0056 | 17,370,000 | 16,120,415.26 | 1,721,520,000,000 | 2,024 | LOUIESE TRADING AND CONSTRUCTION | 7 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (THIRD LEGISLATIVE DISTRICT) | Palawan 3rd District Engineering Office | 17370000 | 16120415.26 | 2024-06-25 | 02/23/2024 | flood_control | construction-of-flood-control-strucuruealong-langogan-river-upstream-rs-palawan-24eg0056 | [object Object] |
e883c93b-9ef9-4a3d-8550-dc3ef66bb746 | 2,024 | Region IV-B | PALAWAN | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN) | Palawan 3rd District Engineering Office | P00824760LZ | Construction of Flood Control Strucurue along Langogan River Downstream (RS), Palawan | P00824760LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Strucurue along Langogan River Downstream (RS), Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.12416 | 10.02751 | 24EG0059 | 17,370,000 | 17,370,000 | 1,726,272,000,000 | 2,024 | TAGUSAO CONSTRUCTION & TRADING INC. (FORMERLY: TAGUSAO CONSTRUCTION & TRADING) | 8 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (THIRD LEGISLATIVE DISTRICT) | Palawan 3rd District Engineering Office | 17370000 | 17370000 | 2024-09-13 | 02/15/2024 | flood_control | construction-of-flood-control-strucurue-along-langogan-river-downstream-rs-palawan-24eg0059 | [object Object] |
e8971e1b-6acc-4ac0-a92f-48ff604c4911 | 2,023 | Region IV-B | PALAWAN | ROXAS (PALAWAN) | Palawan 1st District Engineering Office | P00726266LZ | Construction of Magsarongsong Bridge Flood Control Structure, Sta. 0 + 000.00 - Sta. 0 + 084.00, Bank I UPSTREAM (L/S), Sta. 0 + 000.00 - Sta. 0 + 084.00, BANK II UPSTREAM (L/S), Roxas, Palawan | P00726266LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Magsarongsong Bridge Flood Control Structure, Sta. 0 + 000.00 - Sta. 0 + 084.00, Bank I UPSTREAM (L/S), Sta. 0 + 000.00 - Sta. 0 + 084.00, BANK II UPSTREAM (L/S), Roxas, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.206224 | 10.25288 | 23EE0029 | 9,064,943.69 | 9,014,282.42 | 1,694,390,400,000 | 2,023 | PANAAD CONSTRUCTION | 9 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 9064943.69 | 9014282.42 | 2023-09-12 | 04/18/2023 | flood_control | construction-of-magsarongsong-bridge-flood-control-structure-sta-0-00000---sta-0-08400-bank-i-upstream-ls-sta-0-00000---sta-0-08400-bank-ii-upstream-ls-roxas-palawan-23ee0029 | [object Object] |
7343ac2c-337b-45c2-8819-91bac6e56b2b | 2,024 | Region I | PANGASINAN | SANTA BARBARA (PANGASINAN) | Region I | P00821520LZ | Construction of Slope Protection along Sinucalan River, Barangay Poblacion Norte, Sta. Barbara, Pangasinan | P00821520LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection along Sinucalan River, Barangay Poblacion Norte, Sta. Barbara, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.400763 | 16.006788 | 24A00250 | 48,250,000 | 48,248,598.38 | 1,727,740,800,000 | 2,024 | ALCEL CONSTRUCTION | 10 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 48250000 | 48248598.38 | 2024-09-23 | 03/07/2024 | flood_control | construction-of-slope-protection-along-sinucalan-river-barangay-poblacion-norte-sta-barbara-pangasinan-24a00250 | [object Object] |
10ebced6-f95c-4190-bd69-e010457825a3 | 2,024 | Region IV-B | ISABELA | ROXAS (ISABELA) | Palawan 1st District Engineering Office | P00820974LZ | Construction of Flood Control Structure along Tulariquin River (RS), Roxas, Palawan | P00820974LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Tulariquin River (RS), Roxas, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.21562 | 10.147 | 24EE0036 | 48,249,976.12 | 48,249,914.4 | 1,734,652,800,000 | 2,024 | YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. / F.F. GALANG CONSTRUCTION | 11 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 48249976.12 | 48249914.4 | 2024-12-11 | 05/20/2024 | flood_control | construction-of-flood-control-structure-along-tulariquin-river-rs-roxas-palawan-24ee0036 | [object Object] |
ccaf0626-00d6-4d87-8544-0404fe4f0075 | 2,024 | Region IV-B | ISABELA | ROXAS (ISABELA) | Palawan 1st District Engineering Office | P00820979LZ | Construction of Slope Protection Structure along Tagumpay Bridge, Roxas, Palawan | P00820979LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Structure along Tagumpay Bridge, Roxas, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.22557 | 10.27601 | 24EE0020 | 44,099,975.3 | 44,095,477.55 | 1,727,913,600,000 | 2,024 | YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. / SEVEN DIGIT CONSTRUCTION AND TRUCKING SERVICES CORP. (FORMERLY: SEVEN DIGIT CONSTRUCTION & SUPPLIES) | 12 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 44099975.3 | 44095477.55 | 2024-10-15 | 02/14/2024 | flood_control | construction-of-slope-protection-structure-along-tagumpay-bridge-roxas-palawan-24ee0020 | [object Object] |
b98fd567-a3a4-47bb-9a5d-add9f327969d | 2,022 | Region IV-B | PALAWAN | ROXAS (PALAWAN) | Palawan 1st District Engineering Office | P00632934LZ | Construction of Sea Wall, Barangay Caramay, Roxas, Palawan | P00632934LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Sea Wall, Barangay Caramay, Roxas, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.231534 | 10.183842 | 22EE0036 | 4,949,962.82 | 4,949,962.82 | 1,658,966,400,000 | 2,022 | A.P. CONSEBIDO CONSTRUCTION AND TRADING | 13 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 4949962.82 | 4949962.82 | 2022-07-29 | 02/17/2022 | flood_control | construction-of-sea-wall-barangay-caramay-roxas-palawan-22ee0036 | [object Object] |
2a9386d4-8655-4dd7-bf63-c3f72aaef593 | 2,024 | Region IV-B | ISABELA | ROXAS (ISABELA) | Palawan 1st District Engineering Office | P00844779LZ | Construction/Improvement of Storm Drainage System at Purok Zambales, Brgy. 3, Roxas, Palawan | P00844779LZ-CW1 | Construction of Drainage Structure - Construction/Improvement of Storm Drainage System at Purok Zambales, Brgy. 3, Roxas, Palawan | null | Construction of Drainage Structure | Flood Control Structures | 119.34648 | 10.32404 | 24EE0113 | 9,899,934.12 | 9,784,647.85 | 1,725,667,200,000 | 2,024 | M.G.M. CONSTRUCTION | 14 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 9899934.12 | 9784647.85 | 2024-12-20 | 03/18/2024 | flood_control | constructionimprovement-of-storm-drainage-system-at-purok-zambales-brgy-3-roxas-palawan-24ee0113 | [object Object] |
53fb5c4f-f246-4881-ba8b-738bc85234d3 | 2,024 | Region IV-B | ISABELA | ROXAS (ISABELA) | Palawan 1st District Engineering Office | P00820975LZ | Construction of Slope Protection Structure along Iraan Bridge, Roxas, Palawan | P00820975LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Structure along Iraan Bridge, Roxas, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.37435 | 10.42931 | 24EE0017 | 44,099,956.7 | 44,097,536.12 | 1,727,913,600,000 | 2,024 | YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. / SEVEN DIGIT CONSTRUCTION AND TRUCKING SERVICES CORP. (FORMERLY: SEVEN DIGIT CONSTRUCTION & SUPPLIES) | 15 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 44099956.7 | 44097536.12 | 2024-10-15 | 02/14/2024 | flood_control | construction-of-slope-protection-structure-along-iraan-bridge-roxas-palawan-24ee0017 | [object Object] |
3ac7782c-4319-40e6-b50b-91d790bb4743 | 2,021 | Region IV-B | PALAWAN | null | Palawan 1st District Engineering Office | P00561401LZ | Construction of Seawall, Brgy. Buenasuerte, El Nido, Palawan | P00561401LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Seawall, Brgy. Buenasuerte, El Nido, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.386389 | 11.180278 | 21EE0101 | 9,899,984.53 | 7,778,048.48 | 1,653,523,200,000 | 2,023 | LOUIESE TRADING AND CONSTRUCTION | 16 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 9899984.53 | 7778048.48 | 2023-06-25 | 01/24/2022 | flood_control | construction-of-seawall-brgy-buenasuerte-el-nido-palawan-21ee0101 | [object Object] |
9614dc72-8dbd-4b62-95f9-cac3975c36c9 | 2,024 | Region IV-B | PALAWAN | EL NIDO (BACUIT) (PALAWAN) | Palawan 1st District Engineering Office | P00820977LZ | Construction of Slope Protection Structure along Lamoro Bridge 1, El Nido, Palawan | P00820977LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Structure along Lamoro Bridge 1, El Nido, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.41688 | 11.19344 | 24EE0074 | 44,099,949.37 | 44,097,774.54 | 1,731,888,000,000 | 2,024 | AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) / A.R.L. CONSTRUCTION | 17 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 44099949.37 | 44097774.54 | 2024-11-19 | 02/14/2024 | flood_control | construction-of-slope-protection-structure-along-lamoro-bridge-1-el-nido-palawan-24ee0074 | [object Object] |
97da2039-0d82-4794-aca2-3d3af711b5a1 | 2,023 | Region IV-B | PALAWAN | EL NIDO (BACUIT) (PALAWAN) | Palawan 1st District Engineering Office | P00726267LZ | Construction of Lamoro Bridge III Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 080.85, El Nido, Palawan | P00726267LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Lamoro Bridge III Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 080.85, El Nido, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.430384 | 11.243519 | 23EE0044 | 9,064,950.34 | 8,929,075.23 | 1,693,699,200,000 | 2,023 | 12-30 CONSTRUCTION AND SUPPLY | 18 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 9064950.34 | 8929075.23 | 2023-12-08 | 04/18/2023 | flood_control | construction-of-lamoro-bridge-iii-flood-control-structure-sta-0-000---sta-0-08085-el-nido-palawan-23ee0044 | [object Object] |
5334fbd7-dbfb-4ee5-9b1a-aa08302fa447 | 2,023 | Region IV-B | PALAWAN | ROXAS (PALAWAN) | Palawan 1st District Engineering Office | P00742461LZ | Construction of Drainage System, Tumarbong, Roxas, Palawan | P00742461LZ-CW1 | Construction of Drainage Structure - Construction of Drainage System, Tumarbong, Roxas, Palawan | null | Construction of Drainage Structure | Flood Control Structures | 119.461795 | 10.379389 | 23EE0063 | 4,949,974.91 | 4,514,354.14 | 1,689,897,600,000 | 2,023 | AFG CONSTRUCTION CORPORATION | 19 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 4949974.91 | 4514354.14 | 2023-06-29 | 03/30/2023 | flood_control | construction-of-drainage-system-tumarbong-roxas-palawan-23ee0063 | [object Object] |
2ab40cfd-ae69-4680-83bf-fed1e0b14c1d | 2,024 | Region IV-B | RIZAL | TAYTAY (RIZAL) | Palawan 1st District Engineering Office | P00820972LZ | Construction of Abongan CIS Drainage Canal, Taytay, Palawan | P00820972LZ-CW1 | Construction of Drainage Structure - Construction of Abongan CIS Drainage Canal, Taytay, Palawan | null | Construction of Drainage Structure | Flood Control Structures | 119.46259 | 10.68633 | 24EE0101 | 19,599,983.05 | 19,598,517.1 | 1,729,987,200,000 | 2,024 | REINASTAR TRADING AND CONSTRUCTION SUPPLY | 20 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 19599983.05 | 19598517.1 | 2024-10-28 | 02/14/2024 | flood_control | construction-of-abongan-cis-drainage-canal-taytay-palawan-24ee0101 | [object Object] |
1311f999-2aae-4f6f-92ed-0e2e709f100f | 2,023 | Region IV-B | PALAWAN | TAYTAY (PALAWAN) | Palawan 1st District Engineering Office | P00726264LZ | Construction of Bato Bridge Flood Control Structure, Taytay, Palawan | P00726264LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Bato Bridge Flood Control Structure, Taytay, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.493683 | 10.717258 | 23EE0027 | 9,064,927.16 | 9,064,029.8 | 1,693,094,400,000 | 2,023 | MAC BUILDERS CIVIL ENGINEERING CONSTRUCTION | 21 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 9064927.16 | 9064029.8 | 2023-10-23 | 03/15/2023 | flood_control | construction-of-bato-bridge-flood-control-structure-taytay-palawan-23ee0027 | [object Object] |
9e23cf0b-899e-472f-95be-f3440200641c | 2,024 | Region IV-B | RIZAL | TAYTAY (RIZAL) | Palawan 1st District Engineering Office | P00820412LZ | Construction of Slope Protection Structure along Balite Bridge, Taytay, Palawan | P00820412LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Structure along Balite Bridge, Taytay, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.496278 | 10.64284 | 24EE0055 | 96,499,945.21 | 96,499,967.12 | 1,733,961,600,000 | 2,024 | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | 22 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 96499945.21 | 96499967.12 | 2024-08-27 | 02/14/2024 | flood_control | construction-of-slope-protection-structure-along-balite-bridge-taytay-palawan-24ee0055 | [object Object] |
5c75f8e7-9510-4ff6-b75c-c3792c6e90dc | 2,024 | Region IV-B | RIZAL | TAYTAY (RIZAL) | Palawan 1st District Engineering Office | P00820414LZ | Construction of Slope Protection Structure along Talog Bridge, Taytay, Palawan | P00820414LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Structure along Talog Bridge, Taytay, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.50026 | 10.64781 | 24EE0054 | 96,499,980.15 | 96,499,998.63 | 1,736,035,200,000 | 2,024 | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | 23 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 96499980.15 | 96499998.63 | 2024-09-20 | 02/14/2024 | flood_control | construction-of-slope-protection-structure-along-talog-bridge-taytay-palawan-24ee0054 | [object Object] |
7a16bc9c-f707-45a9-8844-c648bcc2bcb5 | 2,024 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00843194LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Boboy Section), Sta. 000+180 - Sta. 000+610, Barangay Boboy, Agno, Pangasinan | P00843194LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Boboy Section), Sta. 000+180 - Sta. 000+610, Barangay Boboy, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.778189 | 16.132714 | 24AG0137 | 96,500,000 | 96,500,000 | 1,730,505,600,000 | 2,024 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES / RANIA CONSTRUCTION AND SUPPLIES | 24 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-09-25 | 04/08/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-boboy-section-sta-000180---sta-000610-barangay-boboy-agno-pangasinan-24ag0137 | [object Object] |
b1c0ab60-5941-4323-9efd-27a8eda0e533 | 2,024 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00843195LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Boboy Section), Sta. 000+610 - Sta. 001+040, Barangay Boboy, Agno, Pangasinan | P00843195LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Boboy Section), Sta. 000+610 - Sta. 001+040, Barangay Boboy, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.781525 | 16.134808 | 24AG0138 | 96,500,000 | 96,500,000 | 1,730,505,600,000 | 2,024 | RANIA CONSTRUCTION AND SUPPLIES / JHI CONSTRUCTION & SUPPLY | 25 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-09-25 | 04/08/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-boboy-section-sta-000610---sta-001040-barangay-boboy-agno-pangasinan-24ag0138 | [object Object] |
8ddbfc3a-89ed-418e-bcdc-4dc61d59a7d6 | 2,023 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726326LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Aloleng Section), Sta. 002+019.5 - Sta. 002+536.1, Barangay Aloleng, Agno, Pangasinan | P00726326LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Aloleng Section), Sta. 002+019.5 - Sta. 002+536.1, Barangay Aloleng, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.787802 | 16.128232 | 23AG0024 | 77,200,000 | 77,200,000 | 1,701,993,600,000 | 2,023 | SAMANTHA ENTERPRISES / ALCEL CONSTRUCTION | 26 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 77200000 | 77200000 | 2023-12-07 | 03/30/2023 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-aloleng-section-sta-0020195---sta-0025361-barangay-aloleng-agno-pangasinan-23ag0024 | [object Object] |
4930b889-6f46-4d84-ba7c-83ab94d599ba | 2,024 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820714LZ | Construction of Flood Mitigation Facilities along Balingcaguing River (Aloleng Section), Sta. 002+059 - Sta. 002+303, Barangay Aloleng, Agno, Pangasinan | P00820714LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Facilities along Balingcaguing River (Aloleng Section), Sta. 002+059 - Sta. 002+303, Barangay Aloleng, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.787876 | 16.131694 | 24AG0017 | 49,000,000 | 49,000,000 | 1,725,062,400,000 | 2,024 | JONIK TRADING & CONSTRUCTION | 27 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 49000000 | 49000000 | 2024-05-03 | 02/05/2024 | flood_control | construction-of-flood-mitigation-facilities-along-balingcaguing-river-aloleng-section-sta-002059---sta-002303-barangay-aloleng-agno-pangasinan-24ag0017 | [object Object] |
82e9acf7-5a04-461f-a0c4-c8c4a00d3cb1 | 2,024 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820122LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Aloleng Section), Sta. 002 + 896.6 - Sta. 003 + 296.6, Barangay Aloleng, Agno, Pangasinan | P00820122LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Aloleng Section), Sta. 002 + 896.6 - Sta. 003 + 296.6, Barangay Aloleng, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.788113 | 16.128254 | 24AG0112 | 96,500,000 | 96,500,000 | 1,736,640,000,000 | 2,024 | SAMANTHA ENTERPRISES / ALCEL CONSTRUCTION | 28 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-12-17 | 04/19/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-aloleng-section-sta-002-8966---sta-003-2966-barangay-aloleng-agno-pangasinan-24ag0112 | [object Object] |
c736b09e-78ee-4c0b-a3df-8d1ac427a8e5 | 2,024 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820127LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion West Section), Sta. 001+848 - Sta. 002+278, Barangay Poblacion West, Agno, Pangasinan | P00820127LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion West Section), Sta. 001+848 - Sta. 002+278, Barangay Poblacion West, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.78954 | 16.128628 | 24AG0015 | 96,500,000 | 96,500,000 | 1,733,184,000,000 | 2,024 | ALCEL CONSTRUCTION | 29 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-08-27 | 02/12/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-poblacion-west-section-sta-001848---sta-002278-barangay-poblacion-west-agno-pangasinan-24ag0015 | [object Object] |
6add0e32-c692-4298-aa3f-0c1302515355 | 2,024 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820126LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion West Section), Sta. 001+418 - Sta. 001+848, Barangay Poblacion West, Agno, Pangasinan | P00820126LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion West Section), Sta. 001+418 - Sta. 001+848, Barangay Poblacion West, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.790688 | 16.124765 | 24AG0014 | 96,500,000 | 96,500,000 | 1,738,540,800,000 | 2,025 | RAMDC CONSTRUCTION AND TRADING / ALCEL CONSTRUCTION | 30 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2025-01-09 | 02/14/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-poblacion-west-section-sta-001418---sta-001848-barangay-poblacion-west-agno-pangasinan-24ag0014 | [object Object] |
00445959-ecbd-4325-a104-f978af054232 | 2,023 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726365LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion West Section) Sta. 001+900-Sta. 002+680, barangay Poblacion West, Agno, Pangasinan | P00726365LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion West Section) Sta. 001+900-Sta. 002+680, barangay Poblacion West, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.792725 | 16.121518 | 23AG0028 | 51,145,000 | 51,145,000 | 1,704,499,200,000 | 2,024 | ALCEL CONSTRUCTION | 31 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 51145000 | 51145000 | 2024-01-05 | 04/13/2023 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-poblacion-west-section-sta-001900-sta-002680-barangay-poblacion-west-agno-pangasinan-23ag0028 | [object Object] |
22848821-ccf2-4cd6-b1d0-3f8cb8542ac8 | 2,024 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820715LZ | Construction of Flood Mitigation Facilities along Balingcaguing River (Poblacion East Section), Sta. 003+436 - Sta. 003+680, Barangay Poblacion East, Agno, Pangasinan | P00820715LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Facilities along Balingcaguing River (Poblacion East Section), Sta. 003+436 - Sta. 003+680, Barangay Poblacion East, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.799836 | 16.113559 | 24AG0018 | 49,000,000 | 49,000,000 | 1,728,950,400,000 | 2,024 | JONIK TRADING & CONSTRUCTION | 32 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 49000000 | 49000000 | 2024-10-16 | 02/05/2024 | flood_control | construction-of-flood-mitigation-facilities-along-balingcaguing-river-poblacion-east-section-sta-003436---sta-003680-barangay-poblacion-east-agno-pangasinan-24ag0018 | [object Object] |
cbf586de-3890-4ef2-9009-faa2cad580a4 | 2,023 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726328LZ | Construction of Flood Mitigation Structure along Balingcaguing River, Sta. 004+564.2 - Sta. 005+073.8, Barangay Poblacion East, Agno, Pangasinan | P00726328LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River, Sta. 004+564.2 - Sta. 005+073.8, Barangay Poblacion East, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.801599 | 16.111824 | 23AG0029 | 77,200,000 | 77,200,000 | 1,703,203,200,000 | 2,023 | JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION | 33 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 77200000 | 77200000 | 2023-12-22 | 04/13/2023 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-sta-0045642---sta-0050738-barangay-poblacion-east-agno-pangasinan-23ag0029 | [object Object] |
89c1a903-3e00-4fee-a348-16bc26aa78ee | 2,024 | Region I | PANGASINAN | AGNO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820123LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Bangan-Oda Section), Sta. 007+850 - Sta. 008+250, Barangay Bangan-Oda, Agno, Pangasinan | P00820123LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Bangan-Oda Section), Sta. 007+850 - Sta. 008+250, Barangay Bangan-Oda, Agno, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.829299 | 16.108686 | 24AG0012 | 96,500,000 | 96,500,000 | 1,740,873,600,000 | 2,025 | JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION | 34 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2025-03-03 | 02/23/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-bangan-oda-section-sta-007850---sta-008250-barangay-bangan-oda-agno-pangasinan-24ag0012 | [object Object] |
b7c6e104-9c32-4af4-9595-081f0c3abacd | 2,022 | Region I | PANGASINAN | DASOL (PANGASINAN) | Pangasinan 1st District Engineering Office | P00631082LZ | Construction of Flood Control Structure, Brgy. Hermosa, Dasol, Pangasinan | P00631082LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Brgy. Hermosa, Dasol, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.865492 | 15.941711 | 22AG0022 | 19,600,000 | 19,600,000 | 1,671,926,400,000 | 2,022 | BERSON'S CONSTRUCTION & TRADING | 35 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 19600000 | 19600000 | 2022-12-26 | 02/10/2022 | flood_control | construction-of-flood-control-structure-brgy-hermosa-dasol-pangasinan-22ag0022 | [object Object] |
b9275770-6532-4bcc-9d16-08bc6714be0d | 2,024 | Region I | PANGASINAN | MABINI (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820124LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Caranglaan Section), Sta. 017+829 - Sta. 018+229, Barangay Caranglaan, Mabini, Pangasinan | P00820124LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Caranglaan Section), Sta. 017+829 - Sta. 018+229, Barangay Caranglaan, Mabini, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.8757 | 16.0883 | 24AG0013 | 96,500,000 | 96,500,000 | 1,733,097,600,000 | 2,024 | ALCEL CONSTRUCTION | 36 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-04-23 | 02/12/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-caranglaan-section-sta-017829---sta-018229-barangay-caranglaan-mabini-pangasinan-24ag0013 | [object Object] |
ec47c4b9-eacd-4be4-a830-8431695e1df6 | 2,023 | Region IV-B | PALAWAN | BUSUANGA (PALAWAN) | Palawan 1st District Engineering Office | P00726265LZ | Construction of Buluang Bridge I Flood Control Structure, Sta. 0 + 044.64 - Sta. 0 + 095.00 (UPSTREAM - BK.I), Sta. 0 + 000 - Sta. 0 + 095.00 (UPSTREAM - BK. II), Sta. 0 + 000.00 - Sta. 0 + 026.00 (DOWNSTREASM - BK. II), Busuanga, Palawan | P00726265LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Buluang Bridge I Flood Control Structure, Sta. 0 + 044.64 - Sta. 0 + 095.00 (UPSTREAM - BK.I), Sta. 0 + 000 - Sta. 0 + 095.00 (UPSTREAM - BK. II), Sta. 0 + 000.00 - Sta. 0 + 026.00 (DOWNSTREASM - BK. II), Busuanga, Palawan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.877454 | 12.221611 | 23EE0030 | 9,064,955.46 | 8,884,656 | 1,689,552,000,000 | 2,023 | MAC BUILDERS CIVIL ENGINEERING CONSTRUCTION | 37 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PALAWAN (FIRST LEGISLATIVE DISTRICT) | Palawan 1st District Engineering Office | 9064955.46 | 8884656 | 2023-08-11 | 04/18/2023 | flood_control | construction-of-buluang-bridge-i-flood-control-structure-sta-0-04464---sta-0-09500-upstream---bki-sta-0-000---sta-0-09500-upstream---bk-ii-sta-0-00000---sta-0-02600-downstreasm---bk-ii-busuanga-palawan-23ee0030 | [object Object] |
3a88fbf3-7301-4396-a408-13adefa3aabf | 2,024 | Region I | PANGASINAN | MABINI (PANGASINAN) | Pangasinan 1st District Engineering Office | P00823306LZ | Construction of Slope Protection Structure along Balingcaguing River (Caranglaan Section), Sta.017+092 - Sta. 017+457, Caranglaan, Mabini, Pangasinan | P00823306LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection Structure along Balingcaguing River (Caranglaan Section), Sta.017+092 - Sta. 017+457, Caranglaan, Mabini, Pangasinan | null | Construction of Slope Protection Structure | Flood Control Structures | 119.886445 | 16.082542 | 24AG0113 | 96,500,000 | 96,500,000 | 1,739,232,000,000 | 2,025 | IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION | 38 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2025-02-12 | 04/19/2024 | flood_control | construction-of-slope-protection-structure-along-balingcaguing-river-caranglaan-section-sta017092---sta-017457-caranglaan-mabini-pangasinan-24ag0113 | [object Object] |
a6cbb013-2ba4-4e87-9d35-9c7c0b71ffd9 | 2,024 | Region I | PANGASINAN | MABINI (PANGASINAN) | Pangasinan 1st District Engineering Office | P00823307LZ | Construction of Slope Protection Structure along Balingcaguing River (Caranglaan Section), Sta.017+457 - Sta. 017+822, Caranglaan, Mabini, Pangasinan | P00823307LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection Structure along Balingcaguing River (Caranglaan Section), Sta.017+457 - Sta. 017+822, Caranglaan, Mabini, Pangasinan | null | Construction of Slope Protection Structure | Flood Control Structures | 119.889496 | 16.081463 | 24AG0102 | 96,500,000 | 96,500,000 | 1,735,257,600,000 | 2,024 | IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION | 39 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-12-28 | 03/04/2024 | flood_control | construction-of-slope-protection-structure-along-balingcaguing-river-caranglaan-section-sta017457---sta-017822-caranglaan-mabini-pangasinan-24ag0102 | [object Object] |
d738b1a6-f0f6-4c2d-982d-f6a67343e554 | 2,024 | Region I | PANGASINAN | BURGOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00821091LZ | Construction of Flood Control along Balingcaguing River, Barangay Anapao, Burgos, Pangasinan | P00821091LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control along Balingcaguing River, Barangay Anapao, Burgos, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.890938 | 16.079879 | 24AG0022 | 72,686,695 | 72,686,685 | 1,725,667,200,000 | 2,024 | CDC CONSTRUCTION & SUPPLIES | 40 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 72686695 | 72686685 | 2024-04-29 | 02/12/2024 | flood_control | construction-of-flood-control-along-balingcaguing-river-barangay-anapao-burgos-pangasinan-24ag0022 | [object Object] |
9523622c-09a0-4c0f-b63c-601b55266521 | 2,023 | Region I | PANGASINAN | MABINI (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726363LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Caranglaan Section), Sta. 017 + 822 - Sta. 018 + 602, Barangay Caranglaan, Mabini, Pangasinan | P00726363LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Caranglaan Section), Sta. 017 + 822 - Sta. 018 + 602, Barangay Caranglaan, Mabini, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.892779 | 16.076452 | 23AG0025 | 53,075,000 | 52,809,625 | 1,698,105,600,000 | 2,023 | ALCEL CONSTRUCTION | 41 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 53075000 | 52809625 | 2023-05-29 | 03/30/2023 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-caranglaan-section-sta-017-822---sta-018-602-barangay-caranglaan-mabini-pangasinan-23ag0025 | [object Object] |
d10e5176-78cf-49d3-a4a9-688837186ad5 | 2,022 | Region I | PANGASINAN | BURGOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00620955LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Tambacan Section) Sta.018+674 - Sta.019+323, Brgy. Tambacan, Burgos, Pangasinan | P00620955LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Tambacan Section) Sta.018+674 - Sta.019+323, Brgy. Tambacan, Burgos, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.894204 | 16.075354 | 22AG0017 | 49,000,000 | 49,000,000 | 1,663,027,200,000 | 2,022 | ALCEL CONSTRUCTION | 42 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 49000000 | 49000000 | 2022-07-12 | 02/17/2022 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-tambacan-section-sta018674---sta019323-brgy-tambacan-burgos-pangasinan-22ag0017 | [object Object] |
fd73323c-c848-4d67-a9da-321dd88ae734 | 2,023 | Region I | PANGASINAN | INFANTA (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726330LZ | Construction of Flood Mitigation Structure along Bayambang River, Sta. 000+500 - Sta. 001+013.1, R/S, Barangay Bayambang, Infanta, Pangasinan | P00726330LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Bayambang River, Sta. 000+500 - Sta. 001+013.1, R/S, Barangay Bayambang, Infanta, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.897591 | 15.88173 | 23AG0031 | 77,200,000 | 77,200,000 | 1,701,993,600,000 | 2,023 | CHIARA2300 INCORPORATED / EJR BUILDERS & CONSTRUCTION SUPPLY | 43 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 77200000 | 77200000 | 2023-09-26 | 03/30/2023 | flood_control | construction-of-flood-mitigation-structure-along-bayambang-river-sta-000500---sta-0010131-rs-barangay-bayambang-infanta-pangasinan-23ag0031 | [object Object] |
d51da612-c3d5-41ab-9759-7fb481483da6 | 2,023 | Region III | ZAMBALES | SANTA CRUZ (ZAMBALES) | Zambales 1st District Engineering Office | P00727153LZ | Construction of Gama River Flood Control Structure, Package 1, Sta. Cruz, Zambales | P00727153LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Gama River Flood Control Structure, Package 1, Sta. Cruz, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.910846 | 15.784678 | 23CL0093 | 48,999,232.94 | 48,117,246.7 | 1,706,313,600,000 | 2,024 | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | 44 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48999232.94 | 48117246.7 | 2024-01-22 | 04/19/2023 | flood_control | construction-of-gama-river-flood-control-structure-package-1-sta-cruz-zambales-23cl0093 | [object Object] |
a77f0876-af81-4150-9708-9346bf4f4225 | 2,024 | Region III | ZAMBALES | SANTA CRUZ (ZAMBALES) | Zambales 1st District Engineering Office | P00824717LZ | Construction of Gama River Slope Protection/ Flood Control Structure Phase 3, Sta. Cruz, Zambales | P00824717LZ-CW1 | Construction of Slope Protection Structure - Construction of Gama River Slope Protection/ Flood Control Structure Phase 3, Sta. Cruz, Zambales | null | Construction of Slope Protection Structure | Flood Control Structures | 119.910956 | 15.788027 | 24CL0123 | 48,249,239.42 | 47,694,698 | 1,725,926,400,000 | 2,024 | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | 45 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48249239.42 | 47694698 | 2024-04-15 | 02/15/2024 | flood_control | construction-of-gama-river-slope-protection-flood-control-structure-phase-3-sta-cruz-zambales-24cl0123 | [object Object] |
8af5760a-14a5-4e8c-8f5e-9d444841fa10 | 2,024 | Region III | ZAMBALES | SANTA CRUZ (ZAMBALES) | Zambales 1st District Engineering Office | P00824716LZ | Construction of Gama River Slope Protection/ Flood Control Structure Phase 2, Sta. Cruz, Zambales | P00824716LZ-CW1 | Construction of Slope Protection Structure - Construction of Gama River Slope Protection/ Flood Control Structure Phase 2, Sta. Cruz, Zambales | null | Construction of Slope Protection Structure | Flood Control Structures | 119.911072 | 15.788168 | 24CL0122 | 48,249,959.91 | 47,695,117 | 1,725,926,400,000 | 2,024 | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | 46 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48249959.91 | 47695117 | 2024-04-15 | 02/15/2024 | flood_control | construction-of-gama-river-slope-protection-flood-control-structure-phase-2-sta-cruz-zambales-24cl0122 | [object Object] |
e611ac6c-bebe-4e46-87b2-bdb63d49010b | 2,022 | Region III | ZAMBALES | SANTA CRUZ (ZAMBALES) | Zambales 1st District Engineering Office | P00640535LZ | Construction of Flood Mitigation Structure, Bayto River (Upstream North Approach), Sta. Cruz, Zambales | P00640535LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure, Bayto River (Upstream North Approach), Sta. Cruz, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.911692 | 15.722124 | 22CL0071 | 29,392,945.08 | 29,698,817.29 | 1,663,113,600,000 | 2,022 | BIG BERTHA CONSTRUCTION & DEVELOPMENT | 47 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 29392945.08 | 29698817.29 | 2022-09-14 | 04/04/2022 | flood_control | construction-of-flood-mitigation-structure-bayto-river-upstream-north-approach-sta-cruz-zambales-22cl0071 | [object Object] |
6e8973e2-d47c-4fad-9199-2b7b75bf6e55 | 2,023 | Region III | ZAMBALES | SANTA CRUZ (ZAMBALES) | Zambales 1st District Engineering Office | P00740644LZ | Construction of Drainage System, Maestre St., Brgy. Poblacion, Sta. Cruz, Zambales | P00740644LZ-CW1 | Construction of Drainage Structure - Construction of Drainage System, Maestre St., Brgy. Poblacion, Sta. Cruz, Zambales | null | Construction of Drainage Structure | Flood Control Structures | 119.914663 | 15.761437 | 23CL0131 | 19,599,664.01 | 19,266,907.03 | 1,700,697,600,000 | 2,023 | GASAT BUILDERS AND SUPPLIES INC. | 48 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 19599664.01 | 19266907.03 | 2023-11-20 | 05/29/2023 | flood_control | construction-of-drainage-system-maestre-st-brgy-poblacion-sta-cruz-zambales-23cl0131 | [object Object] |
1b1437c9-4ac8-4b96-b58c-93bafb01eb95 | 2,022 | Region III | ZAMBALES | CANDELARIA (ZAMBALES) | Zambales 1st District Engineering Office | P00631277LZ | Construction of Line Canal, Barangay Libertador, Candelaria, Zambales | P00631277LZ-CW1 | Construction of Drainage Structure - Construction of Line Canal, Barangay Libertador, Candelaria, Zambales | null | Construction of Drainage Structure | Flood Control Structures | 119.915881 | 15.622302 | 22CL0017 | 9,800,000 | 9,506,441.08 | 1,657,065,600,000 | 2,022 | JAM-C BUILDERS | 49 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 9800000 | 9506441.08 | 2022-07-25 | 03/10/2022 | flood_control | construction-of-line-canal-barangay-libertador-candelaria-zambales-22cl0017 | [object Object] |
d738bf70-8c3b-4bcc-8857-b17853f2a130 | 2,023 | Region I | PANGASINAN | INFANTA (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726327LZ | Construction of Flood Mitigation Structure along Nayom River, Sta. 005+775.6 - Sta. 006+285.2, Barangay Maya, Infanta, Pangasinan | P00726327LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Nayom River, Sta. 005+775.6 - Sta. 006+285.2, Barangay Maya, Infanta, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.923106 | 15.816277 | 23AG0032 | 77,200,000 | 77,200,000 | 1,704,585,600,000 | 2,023 | ALCEL CONSTRUCTION | 50 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 77200000 | 77200000 | 2023-12-19 | 03/30/2023 | flood_control | construction-of-flood-mitigation-structure-along-nayom-river-sta-0057756---sta-0062852-barangay-maya-infanta-pangasinan-23ag0032 | [object Object] |
48737bd6-16b0-4a06-837d-dfa4e87cd238 | 2,024 | Region I | PANGASINAN | MABINI (PANGASINAN) | Pangasinan 1st District Engineering Office | P00843196LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Calzada Section), Sta. 025+700 - Sta. 026+130, Barangay Calzada, Mabini, Pangasinan | P00843196LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Calzada Section), Sta. 025+700 - Sta. 026+130, Barangay Calzada, Mabini, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.926663 | 16.078171 | 24AG0139 | 96,500,000 | 96,500,000 | 1,738,281,600,000 | 2,025 | ANORE CONSTRUCTION | 51 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2025-01-31 | 04/08/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-calzada-section-sta-025700---sta-026130-barangay-calzada-mabini-pangasinan-24ag0139 | [object Object] |
a4114702-f7d0-4c36-b588-ab5abdf5b9fa | 2,024 | Region I | PANGASINAN | INFANTA (PANGASINAN) | Pangasinan 1st District Engineering Office | P00824834LZ | Construction of Slope Protection Structure along Nayom River, Sta.006+285.2 - Sta. 006+922.2, Maya, lnfanta, Pangasinan | P00824834LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Structure along Nayom River, Sta.006+285.2 - Sta. 006+922.2, Maya, lnfanta, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.928258 | 15.807302 | 24AG0091 | 96,500,000 | 96,500,000 | 1,733,443,200,000 | 2,024 | IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION | 52 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-12-06 | 02/12/2024 | flood_control | construction-of-slope-protection-structure-along-nayom-river-sta0062852---sta-0069222-maya-lnfanta-pangasinan-24ag0091 | [object Object] |
c23f051a-2453-4461-911a-2888bb31d5fa | 2,024 | Region I | PANGASINAN | MABINI (PANGASINAN) | Pangasinan 1st District Engineering Office | P00843197LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Calzada Section), Sta. 026+130 - Sta. 026+560, Barangay Calzada, Mabini, Pangasinan | P00843197LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Calzada Section), Sta. 026+130 - Sta. 026+560, Barangay Calzada, Mabini, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.929609 | 16.075554 | 24AG0140 | 96,500,000 | 96,500,000 | 1,739,232,000,000 | 2,025 | ANORE CONSTRUCTION | 53 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2025-02-12 | 04/19/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-calzada-section-sta-026130---sta-026560-barangay-calzada-mabini-pangasinan-24ag0140 | [object Object] |
300ee6c5-8b9c-4cf3-a7ef-f78323cd5315 | 2,024 | Region I | PANGASINAN | INFANTA (PANGASINAN) | Pangasinan 1st District Engineering Office | P00824835LZ | Construction of Slope Protection Structure along Nayom River, Sta.006+922.2 - Sta. 007+559.2, Maya, lnfanta, Pangasinan | P00824835LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Structure along Nayom River, Sta.006+922.2 - Sta. 007+559.2, Maya, lnfanta, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.933349 | 15.810125 | 24AG0093 | 96,500,000 | 96,500,000 | 1,734,393,600,000 | 2,024 | IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION | 54 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-12-18 | 02/23/2024 | flood_control | construction-of-slope-protection-structure-along-nayom-river-sta0069222---sta-0075592-maya-lnfanta-pangasinan-24ag0093 | [object Object] |
015c6375-7c9d-4aee-8ec4-da57fdd46da7 | 2,024 | Region I | PANGASINAN | INFANTA (PANGASINAN) | Pangasinan 1st District Engineering Office | P00843180LZ | Construction of Bank Slope Protection along Nayom River, Sta. 007+559.2 - Sta. 008+159.2, Barangay Maya, Infanta, Pangasinan | P00843180LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Bank Slope Protection along Nayom River, Sta. 007+559.2 - Sta. 008+159.2, Barangay Maya, Infanta, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.938083 | 15.81281 | 24AG0136 | 96,500,000 | 96,500,000 | 1,738,627,200,000 | 2,025 | ANORE CONSTRUCTION | 55 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2025-02-05 | 04/12/2024 | flood_control | construction-of-bank-slope-protection-along-nayom-river-sta-0075592---sta-0081592-barangay-maya-infanta-pangasinan-24ag0136 | [object Object] |
ba5074a1-0f91-4d5d-ae9e-afdf600ff6d1 | 2,023 | Region I | PANGASINAN | MABINI (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726364LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion Section), Sta. 027 + 420 - Sta. 028 + 200, Barangay Poblacion, Mabini, Pangasinan | P00726364LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion Section), Sta. 027 + 420 - Sta. 028 + 200, Barangay Poblacion, Mabini, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.940066 | 16.068056 | 23AG0027 | 53,075,000 | 53,075,000 | 1,700,697,600,000 | 2,023 | CHIARA2300 INCORPORATED / EJR BUILDERS & CONSTRUCTION SUPPLY | 56 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 53075000 | 53075000 | 2023-11-24 | 03/30/2023 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-poblacion-section-sta-027-420---sta-028-200-barangay-poblacion-mabini-pangasinan-23ag0027 | [object Object] |
71264687-ae2f-45ee-b7d3-6875268c7cb3 | 2,024 | Region I | PANGASINAN | MABINI (PANGASINAN) | Pangasinan 1st District Engineering Office | P00821105LZ | Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion Section), Sta. 027+880 - Sta. 028+203, Barangay Poblacion, Mabini, Pangasinan | P00821105LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Balingcaguing River (Poblacion Section), Sta. 027+880 - Sta. 028+203, Barangay Poblacion, Mabini, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.94275 | 16.058989 | 24AG0023 | 72,687,660 | 72,687,660 | 1,737,244,800,000 | 2,025 | BERSON'S CONSTRUCTION & TRADING | 57 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 72687660 | 72687660 | 2025-01-20 | 02/12/2024 | flood_control | construction-of-flood-mitigation-structure-along-balingcaguing-river-poblacion-section-sta-027880---sta-028203-barangay-poblacion-mabini-pangasinan-24ag0023 | [object Object] |
72e8d2cc-19c3-4a91-a547-49b3b10addd0 | 2,024 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820716LZ | Construction of Flood Mitigation Facilities, Alaminos River (Palamis Section), Sta. 016+340 - Sta. 016+584, Barangay Palamis, Alaminos City, Pangasinan | P00820716LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Facilities, Alaminos River (Palamis Section), Sta. 016+340 - Sta. 016+584, Barangay Palamis, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.947081 | 16.140739 | 24AG0019 | 49,000,000 | 49,000,000 | 1,725,062,400,000 | 2,024 | CDC CONSTRUCTION & SUPPLIES | 58 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 49000000 | 49000000 | 2024-04-11 | 02/05/2024 | flood_control | construction-of-flood-mitigation-facilities-alaminos-river-palamis-section-sta-016340---sta-016584-barangay-palamis-alaminos-city-pangasinan-24ag0019 | [object Object] |
ccb3662b-ddad-42ee-ba9a-20c5766ff3d9 | 2,023 | Region III | ZAMBALES | IBA (CAPITAL) (ZAMBALES) | Zambales 1st District Engineering Office | P00727154LZ | Construction of Marangla River Flood Control Structure, Package 1, Iba, Zambales | P00727154LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Marangla River Flood Control Structure, Package 1, Iba, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.961637 | 15.38565 | 23CL0074 | 48,999,487.57 | 48,995,000.77 | 1,704,585,600,000 | 2,023 | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | 59 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48999487.57 | 48995000.77 | 2023-11-22 | 04/14/2023 | flood_control | construction-of-marangla-river-flood-control-structure-package-1-iba-zambales-23cl0074 | [object Object] |
f35a2ffc-9023-4720-9676-77a20c203c80 | 2,022 | Region III | ZAMBALES | PALAUIG (ZAMBALES) | Zambales 1st District Engineering Office | P00630935LZ | Construction of Slope Protection along Olongapo-Bugallon Road, Pangolingan Section (Phase 3), Palauig, Zambales | P00630935LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Olongapo-Bugallon Road, Pangolingan Section (Phase 3), Palauig, Zambales | null | Construction of Slope Protection Structure | Flood Control Structures | 119.961721 | 15.475036 | 22CL0057 | 96,494,951.88 | 96,498,232.03 | 1,679,961,600,000 | 2,023 | STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) | 60 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 96494951.88 | 96498232.03 | 2023-03-23 | 04/04/2022 | flood_control | construction-of-slope-protection-along-olongapo-bugallon-road-pangolingan-section-phase-3-palauig-zambales-22cl0057 | [object Object] |
7dac9899-47cb-4254-a512-fe00004039cd | 2,022 | Region III | ZAMBALES | PALAUIG (ZAMBALES) | Zambales 1st District Engineering Office | P00630936LZ | Construction of Slope Protection along Olongapo-Bugallon Road, Salaza Section (Phase 3), Palauig, Zambales | P00630936LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Olongapo-Bugallon Road, Salaza Section (Phase 3), Palauig, Zambales | null | Construction of Slope Protection Structure | Flood Control Structures | 119.963464 | 15.470612 | 22CL0018 | 96,499,280.08 | 96,482,482.65 | 1,678,924,800,000 | 2,023 | STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) | 61 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 96499280.08 | 96482482.65 | 2023-02-17 | 03/23/2022 | flood_control | construction-of-slope-protection-along-olongapo-bugallon-road-salaza-section-phase-3-palauig-zambales-22cl0018 | [object Object] |
9447d1ac-f474-418b-9f7b-24d752d3f854 | 2,022 | Region III | ZAMBALES | PALAUIG (ZAMBALES) | Zambales 1st District Engineering Office | P00630937LZ | Construction of Slope Protection along Olongapo-Bugallon Road, Salaza Section (Phase 4), Palauig, Zambales | P00630937LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Olongapo-Bugallon Road, Salaza Section (Phase 4), Palauig, Zambales | null | Construction of Slope Protection Structure | Flood Control Structures | 119.963464 | 15.47062 | 22CL0019 | 96,494,369.21 | 91,669,651.44 | 1,678,924,800,000 | 2,023 | STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) | 62 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 96494369.21 | 91669651.44 | 2023-03-20 | 03/23/2022 | flood_control | construction-of-slope-protection-along-olongapo-bugallon-road-salaza-section-phase-4-palauig-zambales-22cl0019 | [object Object] |
ad0089cf-43a2-4d1c-8319-8973e7c013c0 | 2,021 | Region III | ZAMBALES | null | Zambales 1st District Engineering Office | P00526066LZ | Construction/Rehabilitation/Improvement of Slope Protection along Olongapo - Bugallon Road, Pangolingan Section (Phase 2), Palauig, Zambales | P00526066LZ-CW1 | Construction of Slope Protection Structure - Construction/Rehabilitation/Improvement of Slope Protection along Olongapo - Bugallon Road, Pangolingan Section (Phase 2), Palauig, Zambales | null | Construction of Slope Protection Structure | Flood Control Structures | 119.963824 | 15.469899 | 21CL0091 | 48,999,266.55 | 46,794,299.56 | 1,668,988,800,000 | 2,022 | STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) | 63 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48999266.55 | 46794299.56 | 2022-12-05 | 04/27/2022 | flood_control | constructionrehabilitationimprovement-of-slope-protection-along-olongapo---bugallon-road-pangolingan-section-phase-2-palauig-zambales-21cl0091 | [object Object] |
e1c7c00f-e573-4611-9693-6d587ad27e03 | 2,024 | Region III | ZAMBALES | SANTA CRUZ (ZAMBALES) | Zambales 1st District Engineering Office | P00824714LZ | Construction of Guisguis Flood Control at Nayum River, Brgy. Guisguis, Sta. Cruz, Zambales | P00824714LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Guisguis Flood Control at Nayum River, Brgy. Guisguis, Sta. Cruz, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.967118 | 15.806961 | 24CL0120 | 48,249,028.28 | 47,670,294 | 1,725,926,400,000 | 2,024 | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | 64 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48249028.28 | 47670294 | 2024-04-15 | 02/15/2024 | flood_control | construction-of-guisguis-flood-control-at-nayum-river-brgy-guisguis-sta-cruz-zambales-24cl0120 | [object Object] |
9cc8952e-d86d-4175-b082-2cecfd61b14b | 2,024 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00824799LZ | Construction of Flood Control Mitigation Structure along Alaminos River, Sta. 009+886 - Sta. 010+425, Barangay Jose, Alaminos City, Pangasinan | P00824799LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Mitigation Structure along Alaminos River, Sta. 009+886 - Sta. 010+425, Barangay Jose, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.968266 | 16.170863 | 24AG0116 | 96,500,000 | 96,500,000 | 1,738,281,600,000 | 2,025 | ANORE CONSTRUCTION | 65 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2025-02-01 | 04/08/2024 | flood_control | construction-of-flood-control-mitigation-structure-along-alaminos-river-sta-009886---sta-010425-barangay-jose-alaminos-city-pangasinan-24ag0116 | [object Object] |
5648772c-288d-493f-957e-f24d5e1b315e | 2,024 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820121LZ | Construction of Flood Mitigation Structure along Alaminos River , Sta. 009+772.9 - Sta. 010+172.9, Barangay Cayucay, Alaminos City, Pangasinan | P00820121LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Alaminos River , Sta. 009+772.9 - Sta. 010+172.9, Barangay Cayucay, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.968294 | 16.17243 | 24AG0011 | 96,500,000 | 96,500,000 | 1,733,097,600,000 | 2,024 | JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION | 66 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-12-03 | 02/23/2024 | flood_control | construction-of-flood-mitigation-structure-along-alaminos-river-sta-0097729---sta-0101729-barangay-cayucay-alaminos-city-pangasinan-24ag0011 | [object Object] |
dbb53f51-7acf-4ab1-9e48-7c7f5b0fc3e5 | 2,025 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00941153LZ | Rehabilitation of Flood Mitigation Structure, Barangay Telbang, Alaminos City, Pangasinan | P00941153LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Flood Mitigation Structure, Barangay Telbang, Alaminos City, Pangasinan | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 119.969155 | 16.096847 | 25AG0078 | 4,950,000 | 4,850,385.71 | 1,747,094,400,000 | 2,025 | GED CONSTRUCTION | 67 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,025 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 4950000 | 4850385.71 | 2025-05-14 | 02/21/2025 | flood_control | rehabilitation-of-flood-mitigation-structure-barangay-telbang-alaminos-city-pangasinan-25ag0078 | [object Object] |
d19c1342-4c24-4b80-88ad-df1d13a68844 | 2,024 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00824798LZ | Construction of Flood Control Mitigation Structure along Alaminos River, Sta. 009+347 - Sta. 009+886, Barangay Jose, Alaminos City, Pangasinan | P00824798LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Mitigation Structure along Alaminos River, Sta. 009+347 - Sta. 009+886, Barangay Jose, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.970262 | 16.173912 | 24AG0115 | 96,500,000 | 96,500,000 | 1,738,281,600,000 | 2,025 | ANORE CONSTRUCTION | 68 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2025-02-01 | 04/08/2024 | flood_control | construction-of-flood-control-mitigation-structure-along-alaminos-river-sta-009347---sta-009886-barangay-jose-alaminos-city-pangasinan-24ag0115 | [object Object] |
6920c4d0-00d5-45cd-bda3-d809b33fdb85 | 2,022 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00620792LZ | Construction of Flood Mitigation Structure along Alaminos River (Palamis Section) Sta.015+259 - Sta.015+979, Brgy. Palamis, Alaminos City, Pangasinan | P00620792LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Alaminos River (Palamis Section) Sta.015+259 - Sta.015+979, Brgy. Palamis, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.971094 | 16.142784 | 22AG0013 | 66,585,000 | 66,585,000 | 1,665,619,200,000 | 2,022 | JASA GD 2000 CONSTRUCTION CORPORATION (FORMERLY:JASA BUILDER'S) / JONIK TRADING & CONSTRUCTION | 69 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 66585000 | 66585000 | 2022-10-14 | 02/17/2022 | flood_control | construction-of-flood-mitigation-structure-along-alaminos-river-palamis-section-sta015259---sta015979-brgy-palamis-alaminos-city-pangasinan-22ag0013 | [object Object] |
b1109409-028e-4a3d-a44d-9c497a3b8bf1 | 2,024 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00823305LZ | Construction of Slope Protection Structure along Alaminos River, Sta.009+372.9 - Sta. 009+772.9, Cayucay, Alaminos City, Pangasinan | P00823305LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection Structure along Alaminos River, Sta.009+372.9 - Sta. 009+772.9, Cayucay, Alaminos City, Pangasinan | null | Construction of Slope Protection Structure | Flood Control Structures | 119.971324 | 16.17346 | 24AG0092 | 96,500,000 | 96,500,000 | 1,734,393,600,000 | 2,024 | IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION | 70 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-12-18 | 02/23/2024 | flood_control | construction-of-slope-protection-structure-along-alaminos-river-sta0093729---sta-0097729-cayucay-alaminos-city-pangasinan-24ag0092 | [object Object] |
c42d29cd-dc0e-4508-8d13-a123c9a5d00f | 2,023 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726332LZ | Construction of Flood Mitigation Structure along Alaminos River, Sta. 010+172.9 - Sta. 010+702.8, Barangay Poblacion to Cayucay, Alaminos City, Pangasinan | P00726332LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Alaminos River, Sta. 010+172.9 - Sta. 010+702.8, Barangay Poblacion to Cayucay, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.971464 | 16.170454 | 23AG0023 | 77,200,000 | 77,200,000 | 1,708,387,200,000 | 2,024 | JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION | 71 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 77200000 | 77200000 | 2024-02-08 | 04/13/2023 | flood_control | construction-of-flood-mitigation-structure-along-alaminos-river-sta-0101729---sta-0107028-barangay-poblacion-to-cayucay-alaminos-city-pangasinan-23ag0023 | [object Object] |
750c0641-68fd-499f-8428-5ea218d2431a | 2,022 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00620794LZ | Construction of Flood Mitigation Structure along Alaminos River (Pogo Section) Sta.010+362 - Sta.011+082, Brgy. Pogo, Alaminos City, Pangasinan | P00620794LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Alaminos River (Pogo Section) Sta.010+362 - Sta.011+082, Brgy. Pogo, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.971992 | 16.167279 | 22AG0015 | 66,585,000 | 66,585,000 | 1,665,619,200,000 | 2,022 | CHIARA2300 INCORPORATED / BERSON'S CONSTRUCTION & TRADING | 72 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 66585000 | 66585000 | 2022-08-30 | 02/17/2022 | flood_control | construction-of-flood-mitigation-structure-along-alaminos-river-pogo-section-sta010362---sta011082-brgy-pogo-alaminos-city-pangasinan-22ag0015 | [object Object] |
bfb4f381-5ea5-440d-8827-74f93f1f1aa9 | 2,022 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00620793LZ | Construction of Flood Mitigation Structure along Alaminos River (Poblacion Section) Sta.011+058 - Sta.011+778, Brgy. Poblacion, Alaminos City, Pangasinan | P00620793LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Alaminos River (Poblacion Section) Sta.011+058 - Sta.011+778, Brgy. Poblacion, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.972413 | 16.16733 | 22AG0014 | 66,971,000 | 66,971,000 | 1,665,619,200,000 | 2,022 | CHIARA2300 INCORPORATED / EJR BUILDERS & CONSTRUCTION SUPPLY | 73 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 66971000 | 66971000 | 2022-07-25 | 02/17/2022 | flood_control | construction-of-flood-mitigation-structure-along-alaminos-river-poblacion-section-sta011058---sta011778-brgy-poblacion-alaminos-city-pangasinan-22ag0014 | [object Object] |
f2dd4754-e8d0-4441-81fb-837c4f2bf5b7 | 2,024 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820120LZ | Construction of Flood Mitigation Structure along Alaminos River (Pogo Section), Sta. 010+525 - Sta. 010+925, Barangay Pogo, Alaminos City, Pangasinan | P00820120LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Alaminos River (Pogo Section), Sta. 010+525 - Sta. 010+925, Barangay Pogo, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.9734 | 16.169862 | 24AG0010 | 96,500,000 | 96,500,000 | 1,733,097,600,000 | 2,024 | CHIARA2300 INCORPORATED / EJR BUILDERS & CONSTRUCTION SUPPLY | 74 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2024-07-17 | 02/12/2024 | flood_control | construction-of-flood-mitigation-structure-along-alaminos-river-pogo-section-sta-010525---sta-010925-barangay-pogo-alaminos-city-pangasinan-24ag0010 | [object Object] |
87f1ca5b-ca71-4121-b625-dbbdfbf39e93 | 2,023 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726361LZ | Construction of Flood Mitigation Structure along Alaminos River (Pogo Section), Sta. 009 + 912 - Sta. 010 + 692, Barangay Pogo, Alaminos City, Pangasinan | P00726361LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Alaminos River (Pogo Section), Sta. 009 + 912 - Sta. 010 + 692, Barangay Pogo, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.975323 | 16.167831 | 23AG0022 | 72,375,000 | 72,375,000 | 1,701,907,200,000 | 2,023 | CDC CONSTRUCTION & SUPPLIES | 75 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 72375000 | 72375000 | 2023-05-22 | 04/13/2023 | flood_control | construction-of-flood-mitigation-structure-along-alaminos-river-pogo-section-sta-009-912---sta-010-692-barangay-pogo-alaminos-city-pangasinan-23ag0022 | [object Object] |
cabc90e6-b38e-407f-9538-19536bb92bdc | 2,023 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00726362LZ | Construction of Flood Mitigation Structure along Alaminos River (Poblacion Section), Sta. 010 + 621 - Sta. 011 + 401, Barangay Poblacion, Alaminos City, Pangasinan | P00726362LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Alaminos River (Poblacion Section), Sta. 010 + 621 - Sta. 011 + 401, Barangay Poblacion, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.975441 | 16.166815 | 23AG0021 | 72,375,000 | 72,375,000 | 1,707,091,200,000 | 2,024 | CHIARA2300 INCORPORATED / BERSON'S CONSTRUCTION & TRADING | 76 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 72375000 | 72375000 | 2024-02-05 | 04/13/2023 | flood_control | construction-of-flood-mitigation-structure-along-alaminos-river-poblacion-section-sta-010-621---sta-011-401-barangay-poblacion-alaminos-city-pangasinan-23ag0021 | [object Object] |
d7857c80-f232-4b40-b516-69705131522b | 2,022 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00620954LZ | Construction of Flood Mitigation Structure along Alaminos River, Palamis Section, Sta. 015+979 - Sta. 016+495, Alaminos, Pangasinan | P00620954LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Alaminos River, Palamis Section, Sta. 015+979 - Sta. 016+495, Alaminos, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.975694 | 16.138594 | 22AG0018 | 49,000,000 | 49,000,000 | 1,667,606,400,000 | 2,022 | JONIK TRADING & CONSTRUCTION / ALCEL CONSTRUCTION | 77 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 49000000 | 49000000 | 2022-11-04 | 02/10/2022 | flood_control | construction-of-flood-mitigation-structure-along-alaminos-river-palamis-section-sta-015979---sta-016495-alaminos-pangasinan-22ag0018 | [object Object] |
2112c80f-3b14-44e3-8320-84525f33ff5e | 2,024 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00824797LZ | Construction of Bank Slope Protection along Alaminos River, Sta. 008+572.9 - Sta. 008+972.9, Barangay Cayucay, Alaminos City, Pangasinan | P00824797LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Bank Slope Protection along Alaminos River, Sta. 008+572.9 - Sta. 008+972.9, Barangay Cayucay, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.976198 | 16.177186 | 24AG0114 | 96,500,000 | 96,500,000 | 1,737,763,200,000 | 2,025 | ANORE CONSTRUCTION | 78 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96500000 | 2025-01-26 | 04/12/2024 | flood_control | construction-of-bank-slope-protection-along-alaminos-river-sta-0085729---sta-0089729-barangay-cayucay-alaminos-city-pangasinan-24ag0114 | [object Object] |
78d66e98-0c04-4323-8c28-1570fb3394c9 | 2,023 | Region III | ZAMBALES | CANDELARIA (ZAMBALES) | Zambales 1st District Engineering Office | P00742162LZ | Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 1) | P00742162LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 1) | null | Construction of Slope Protection Structure | Flood Control Structures | 119.979884 | 15.586431 | 23CL0070 | 98,999,412.33 | 98,009,377.11 | 1,709,769,600,000 | 2,023 | DMLC BUILDERS | 79 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 98999412.33 | 98009377.11 | 2023-11-22 | 04/14/2023 | flood_control | construction-of-slope-protection-at-pinagrealan-upstream-candelaria-zambales-phase-1-23cl0070 | [object Object] |
99b02e22-67d0-4535-8c2f-d0981ab1c7f9 | 2,023 | Region III | ZAMBALES | CANDELARIA (ZAMBALES) | Zambales 1st District Engineering Office | P00742147LZ | Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 2) | P00742147LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 2) | null | Construction of Slope Protection Structure | Flood Control Structures | 119.979884 | 15.586438 | 23CL0071 | 98,999,606.49 | 98,999,501.03 | 1,709,769,600,000 | 2,023 | DMLC BUILDERS | 80 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 98999606.49 | 98999501.03 | 2023-11-22 | 04/14/2023 | flood_control | construction-of-slope-protection-at-pinagrealan-upstream-candelaria-zambales-phase-2-23cl0071 | [object Object] |
c1fcf0ea-f4fe-42eb-ab3c-26ba54859916 | 2,024 | Region III | ZAMBALES | SANTA CRUZ (ZAMBALES) | Zambales 1st District Engineering Office | P00824715LZ | Construction of Guinabon Flood Control at Nayum River, Brgy. Guinabon, Sta. Cruz, Zambales | P00824715LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Guinabon Flood Control at Nayum River, Brgy. Guinabon, Sta. Cruz, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.984052 | 15.809271 | 24CL0121 | 48,248,273.33 | 47,669,194 | 1,725,926,400,000 | 2,024 | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | 81 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48248273.33 | 47669194 | 2024-04-15 | 02/15/2024 | flood_control | construction-of-guinabon-flood-control-at-nayum-river-brgy-guinabon-sta-cruz-zambales-24cl0121 | [object Object] |
4ded5ba9-7fad-42a1-8946-a73865b0f24d | 2,023 | Region III | ZAMBALES | CANDELARIA (ZAMBALES) | Zambales 1st District Engineering Office | P00742148LZ | Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 3) | P00742148LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 3) | null | Construction of Slope Protection Structure | Flood Control Structures | 119.988579 | 15.594575 | 23CL0072 | 98,999,633.54 | 98,999,273.23 | 1,709,769,600,000 | 2,023 | JTC CRUZ CONSTRUCTION CO., INC. | 82 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 98999633.54 | 98999273.23 | 2023-11-22 | 04/14/2023 | flood_control | construction-of-slope-protection-at-pinagrealan-upstream-candelaria-zambales-phase-3-23cl0072 | [object Object] |
e4e02780-5250-419e-8a8e-6032bffbfbff | 2,023 | Region III | ZAMBALES | CANDELARIA (ZAMBALES) | Zambales 1st District Engineering Office | P00742149LZ | Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 4) | P00742149LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection at Pinagrealan, Upstream, Candelaria, Zambales (Phase 4) | null | Construction of Slope Protection Structure | Flood Control Structures | 119.990359 | 15.594505 | 23CL0073 | 98,999,994.92 | 98,999,798.68 | 1,709,769,600,000 | 2,023 | JTC CRUZ CONSTRUCTION CO., INC. | 83 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 98999994.92 | 98999798.68 | 2023-11-22 | 04/14/2023 | flood_control | construction-of-slope-protection-at-pinagrealan-upstream-candelaria-zambales-phase-4-23cl0073 | [object Object] |
2688f2a7-5185-417e-ab50-0296f8893c93 | 2,023 | Region III | ZAMBALES | CANDELARIA (ZAMBALES) | Zambales 1st District Engineering Office | P00742381LZ | Construction of Slope Protection at Lawis River Upstream, Candelaria, Zambales (Phase 2) | P00742381LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection at Lawis River Upstream, Candelaria, Zambales (Phase 2) | null | Construction of Slope Protection Structure | Flood Control Structures | 119.993756 | 15.593231 | 23CL0083 | 98,999,766.65 | 98,999,580.83 | 1,710,028,800,000 | 2,023 | JTC CRUZ CONSTRUCTION CO., INC. | 84 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 98999766.65 | 98999580.83 | 2023-11-22 | 04/17/2023 | flood_control | construction-of-slope-protection-at-lawis-river-upstream-candelaria-zambales-phase-2-23cl0083 | [object Object] |
8cf89088-6f8a-4308-836a-41c52845db6f | 2,022 | Region III | ZAMBALES | BOTOLAN (ZAMBALES) | Zambales 1st District Engineering Office | P00620187LZ | Construction of Slope Protection/Sea Wall, Brgy. Bangan, Botolan, Zambales | P00620187LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection/Sea Wall, Brgy. Bangan, Botolan, Zambales | null | Construction of Slope Protection Structure | Flood Control Structures | 120.007582 | 15.275352 | 22CL0004 | 72,261,600.37 | 69,009,815.77 | 1,663,545,600,000 | 2,022 | HIGH STRENGTH DEV. CORPORATION | 85 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 72261600.37 | 69009815.77 | 2022-07-18 | 02/23/2022 | flood_control | construction-of-slope-protectionsea-wall-brgy-bangan-botolan-zambales-22cl0004 | [object Object] |
679a3ec3-dcdd-468b-88f7-dc6896f79f44 | 2,022 | Region III | ZAMBALES | IBA (CAPITAL) (ZAMBALES) | Zambales 1st District Engineering Office | P00640537LZ | Construction of Flood Mitigation Structure,Tambak River (Upstream) Phase III, Iba, Zambales | P00640537LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure,Tambak River (Upstream) Phase III, Iba, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.008196 | 15.332465 | 22CL0079 | 37,230,435.15 | 37,620,000 | 1,664,409,600,000 | 2,022 | CDC CONSTRUCTION & SUPPLIES | 86 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 37230435.15 | 37620000 | 2022-09-27 | 04/04/2022 | flood_control | construction-of-flood-mitigation-structuretambak-river-upstream-phase-iii-iba-zambales-22cl0079 | [object Object] |
2c830409-c71f-40cf-b3e2-afe79f8529b1 | 2,022 | Region III | ZAMBALES | IBA (CAPITAL) (ZAMBALES) | Zambales 1st District Engineering Office | P00640538LZ | Construction of Flood Mitigation Structure,Tambak River (Upstream) Phase IV, Iba, Zambales | P00640538LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure,Tambak River (Upstream) Phase IV, Iba, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.008643 | 15.334361 | 22CL0080 | 37,235,289.06 | 37,620,000 | 1,664,409,600,000 | 2,022 | ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) | 87 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 37235289.06 | 37620000 | 2022-09-26 | 04/04/2022 | flood_control | construction-of-flood-mitigation-structuretambak-river-upstream-phase-iv-iba-zambales-22cl0080 | [object Object] |
88afd358-e2f5-4770-ae20-ac8c55bbd005 | 2,024 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00820713LZ | Construction of Flood Mitigation Facilities along Alaminos River (Barangay Cabatuan - Victoria Section), Sta. 024+385 - Sta. 024+629, Alaminos City, Pangasinan | P00820713LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Facilities along Alaminos River (Barangay Cabatuan - Victoria Section), Sta. 024+385 - Sta. 024+629, Alaminos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.008678 | 16.115065 | 24AG0016 | 49,000,000 | 49,000,000 | 1,725,062,400,000 | 2,024 | ALCEL CONSTRUCTION | 88 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 49000000 | 49000000 | 2024-07-18 | 02/05/2024 | flood_control | construction-of-flood-mitigation-facilities-along-alaminos-river-barangay-cabatuan---victoria-section-sta-024385---sta-024629-alaminos-city-pangasinan-24ag0016 | [object Object] |
84ec171c-b8ad-43f0-9dd9-d1b12c0ef332 | 2,024 | Region III | ZAMBALES | IBA (CAPITAL) (ZAMBALES) | Zambales 1st District Engineering Office | P00844770LZ | Construction of Flood Control Structure along Bancal-San Isidro-Mambog River (Totun Lanum) Phase 3, Sitio Tambak, (North Side), Barangay Palanginan, Iba, Zambales | P00844770LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bancal-San Isidro-Mambog River (Totun Lanum) Phase 3, Sitio Tambak, (North Side), Barangay Palanginan, Iba, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.008689 | 15.319846 | 24CL0127 | 48,249,885.77 | 47,579,211.86 | 1,731,715,200,000 | 2,024 | RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) | 89 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48249885.77 | 47579211.86 | 2024-11-13 | 02/22/2024 | flood_control | construction-of-flood-control-structure-along-bancal-san-isidro-mambog-river-totun-lanum-phase-3-sitio-tambak-north-side-barangay-palanginan-iba-zambales-24cl0127 | [object Object] |
d99e4850-a93f-4ca3-b4ba-5e03bb261f8e | 2,024 | Region I | PANGASINAN | CITY OF ALAMINOS (PANGASINAN) | Pangasinan 1st District Engineering Office | P00843215LZ | Construction of Flood Control Structure, Brgy. Lucap, Alaminos City, Pangasinan (Package II) | P00843215LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Brgy. Lucap, Alaminos City, Pangasinan (Package II) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.008813 | 16.182669 | 24AG0021 | 96,500,000 | 96,491,365.52 | 1,740,873,600,000 | 2,025 | ORIENTAL SALES CENTER AND CONTRACTOR / ALCEL CONSTRUCTION | 90 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 96500000 | 96491365.52 | 2025-03-03 | 02/12/2024 | flood_control | construction-of-flood-control-structure-brgy-lucap-alaminos-city-pangasinan-package-ii-24ag0021 | [object Object] |
e930eae0-0ff2-4b03-a3cd-1da761bcf3d2 | 2,022 | Region III | ZAMBALES | IBA (CAPITAL) (ZAMBALES) | Zambales 1st District Engineering Office | P00640536LZ | Construction of Flood Mitigation Structure,Tambak River (Upstream) Phase II, Iba, Zambales | P00640536LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure,Tambak River (Upstream) Phase II, Iba, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.009491 | 15.330417 | 22CL0073 | 38,903,735.02 | 39,303,000 | 1,664,409,600,000 | 2,022 | CDC CONSTRUCTION & SUPPLIES | 91 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 38903735.02 | 39303000 | 2022-09-28 | 04/04/2022 | flood_control | construction-of-flood-mitigation-structuretambak-river-upstream-phase-ii-iba-zambales-22cl0073 | [object Object] |
9a737f6d-8ec9-4581-a34b-e23d115908bc | 2,022 | Region III | ZAMBALES | IBA (CAPITAL) (ZAMBALES) | Zambales 1st District Engineering Office | P00640540LZ | Construction of Slope Protection/Flood Control Structure along Tambak River (Upstream), Phase 6, Iba, Zambales | P00640540LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection/Flood Control Structure along Tambak River (Upstream), Phase 6, Iba, Zambales | null | Construction of Slope Protection Structure | Flood Control Structures | 120.010577 | 15.333914 | 22CL0081 | 48,996,495.64 | 49,500,000 | 1,665,705,600,000 | 2,022 | CDC CONSTRUCTION & SUPPLIES | 92 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48996495.64 | 49500000 | 2022-12-12 | 04/04/2022 | flood_control | construction-of-slope-protectionflood-control-structure-along-tambak-river-upstream-phase-6-iba-zambales-22cl0081 | [object Object] |
1371d998-81c5-4670-9c04-e9c8f901d288 | 2,022 | Region III | ZAMBALES | IBA (CAPITAL) (ZAMBALES) | Zambales 1st District Engineering Office | P00640539LZ | Construction of Flood Mitigation Structure,Tambak River (Upstream), Iba, Zambales | P00640539LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure,Tambak River (Upstream), Iba, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.011307 | 15.327896 | 22CL0072 | 38,903,704.46 | 39,303,000 | 1,664,409,600,000 | 2,022 | HIGH STRENGTH DEV. CORPORATION | 93 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 38903704.46 | 39303000 | 2022-09-28 | 04/04/2022 | flood_control | construction-of-flood-mitigation-structuretambak-river-upstream-iba-zambales-22cl0072 | [object Object] |
1b9ec79f-ded8-4545-a797-9e4b6ba644bc | 2,023 | Region III | ZAMBALES | BOTOLAN (ZAMBALES) | Region III | P00725703LZ | Construction of Flood Control Structure at Bucao River North Approach Downstream, Botolan, Zambales | P00725703LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure at Bucao River North Approach Downstream, Botolan, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.015853 | 15.269167 | 23C00072 | 96,499,311.36 | 96,499,292.34 | 1,712,966,400,000 | 2,023 | NICLEDON CONSTRUCTION / GRACE CONSTRUCTION CORPORATION | 94 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 96499311.36 | 96499292.34 | 2023-12-16 | 06/20/2023 | flood_control | construction-of-flood-control-structure-at-bucao-river-north-approach-downstream-botolan-zambales-23c00072 | [object Object] |
d7f26a80-1771-49e3-8ce3-1ea48f7833a8 | 2,023 | Region III | ZAMBALES | BOTOLAN (ZAMBALES) | Zambales 1st District Engineering Office | P00740643LZ | Construction of Flood Control along Batonlapoc Creek, Batonlapoc, Botolan, Zambales | P00740643LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control along Batonlapoc Creek, Batonlapoc, Botolan, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.028599 | 15.290068 | 23CL0081 | 29,399,608.39 | 28,870,422.99 | 1,702,252,800,000 | 2,023 | MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION) | 95 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 29399608.39 | 28870422.99 | 2023-12-07 | 04/17/2023 | flood_control | construction-of-flood-control-along-batonlapoc-creek-batonlapoc-botolan-zambales-23cl0081 | [object Object] |
d3581540-3ebb-441c-8080-c0477c6cc2ad | 2,023 | Region III | ZAMBALES | BOTOLAN (ZAMBALES) | Zambales 1st District Engineering Office | P00726748LZ | Construction of Flood Control Structure at Bucao River North Approach Downstream Phase 2, Botolan, Zambales | P00726748LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure at Bucao River North Approach Downstream Phase 2, Botolan, Zambales | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.03 | 15.2656 | 23CL0024 | 48,999,304.04 | 48,998,700.23 | 1,702,771,200,000 | 2,023 | R.A. PAHATI CONST. & SUPPLY, INC. | 96 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48999304.04 | 48998700.23 | 2023-11-22 | 02/22/2023 | flood_control | construction-of-flood-control-structure-at-bucao-river-north-approach-downstream-phase-2-botolan-zambales-23cl0024 | [object Object] |
1d08501c-5223-4cc8-afb3-fb891d63f06f | 2,023 | Region I | PANGASINAN | DAGUPAN CITY (PANGASINAN) | Region I | P00726837LZ | Construction of Riverbank Protection along Sinucalan River, Barangay Bacayao Norte, Dagupan City, Pangasinan | P00726837LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection along Sinucalan River, Barangay Bacayao Norte, Dagupan City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.034463 | 16.034463 | 23A00281 | 106,150,000 | 106,150,000 | 1,706,745,600,000 | 2,024 | BET CONSTRUCTION & SUPPLY | 97 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 106150000 | 106150000 | 2024-02-02 | 05/09/2023 | flood_control | construction-of-riverbank-protection-along-sinucalan-river-barangay-bacayao-norte-dagupan-city-pangasinan-23a00281 | [object Object] |
32b629f8-3c1d-481c-87d4-574ad1683e41 | 2,022 | Region III | ZAMBALES | BOTOLAN (ZAMBALES) | Zambales 1st District Engineering Office | P00620555LZ | Rehabilitation of Flood Control Structure at Bucao River, Upstream, Sta. 0 + 500 - Sta. 0 + 950, Botolan, Zambales | P00620555LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Flood Control Structure at Bucao River, Upstream, Sta. 0 + 500 - Sta. 0 + 950, Botolan, Zambales | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.040069 | 15.269232 | 22CL0043 | 48,999,306.81 | 47,039,334.54 | 1,664,064,000,000 | 2,022 | ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) | 98 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 48999306.81 | 47039334.54 | 2022-09-28 | 03/16/2022 | flood_control | rehabilitation-of-flood-control-structure-at-bucao-river-upstream-sta-0-500---sta-0-950-botolan-zambales-22cl0043 | [object Object] |
82b91903-910e-4ba6-9caa-70c367f4a16f | 2,022 | Region III | BULACAN | SAN MIGUEL (BULACAN) | Bulacan 2nd District Engineering Office | P00620523LZ | Construction of Flood Control Structure along Bulo River, San Miguel, Bulacan | P00620523LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bulo River, San Miguel, Bulacan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.04711 | 15.24101 | 22CD0047 | 46,059,437.96 | 46,031,419.24 | 1,662,768,000,000 | 2,022 | MRRM TRADING & CONSTRUCTION | 99 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BULACAN (THIRD LEGISLATIVE DISTRICT) | Bulacan 2nd District Engineering Office | 46059437.96 | 46031419.24 | 2022-09-11 | 02/28/2022 | flood_control | construction-of-flood-control-structure-along-bulo-river-san-miguel-bulacan-22cd0047 | [object Object] |
ffcceeae-cf26-4ea7-ba96-4b8d2e3ec4f9 | 2,023 | Region III | ZAMBALES | CABANGAN (ZAMBALES) | Zambales 1st District Engineering Office | P00742377LZ | Construction of Slope Protection Structure (Upstream L/S) along the highway going to Olongapo, Barangay Banuanbayo, Cabangan, Zambales | P00742377LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection Structure (Upstream L/S) along the highway going to Olongapo, Barangay Banuanbayo, Cabangan, Zambales | null | Construction of Slope Protection Structure | Flood Control Structures | 120.055051 | 15.156488 | 23CL0138 | 5,939,285.37 | 5,850,198.15 | 1,698,278,400,000 | 2,023 | KAEE CONSTRUCTION SERVICES | 100 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ZAMBALES (SECOND LEGISLATIVE DISTRICT) | Zambales 1st District Engineering Office | 5939285.37 | 5850198.15 | 2023-10-23 | 05/31/2023 | flood_control | construction-of-slope-protection-structure-upstream-ls-along-the-highway-going-to-olongapo-barangay-banuanbayo-cabangan-zambales-23cl0138 | [object Object] |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.